{"id":8154,"date":"2022-08-04T15:27:09","date_gmt":"2022-08-04T13:27:09","guid":{"rendered":"http:\/\/wordpress.p638627.webspaceconfig.de\/facade-milling-with-precision-2\/"},"modified":"2023-08-25T10:38:47","modified_gmt":"2023-08-25T08:38:47","slug":"facade-milling-with-precision","status":"publish","type":"post","link":"https:\/\/kemroc.com\/staging\/facade-milling-with-precision\/","title":{"rendered":"Facade milling with precision"},"content":{"rendered":"<h3 class=\"wp-block-heading\"><strong><strong>While renovating of a school building, the contracting company used a KEMROC EX 60 HD planer.<\/strong><\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">One part of the renovation process of a school in Giessen (Germany) was to replace the building\u2019s fa\u00e7ade. As the reinforced concrete shell could not be removed by hand, Leinweber, a construction and demolition company, rented a KEMROC EX 60 HD milling attachment for its excavator. With this combination of equipment, the building\u2019s outer shell was removed with precision and many times faster than would have been possible by hand.<\/p>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-f579e2df-c02e-4f67-a9cb-2ca7bedea816\" href=\"https:\/\/kemroc.com\/us\/us\/wp-content\/uploads\/2023\/07\/Medienbericht_2022-08_Fassade-abfraesen-mit-Praezision-1.pdf\">Medienbericht_2022-08_Fassade-abfraesen-mit-Praezision-1<\/a><a href=\"https:\/\/kemroc.com\/us\/us\/wp-content\/uploads\/2023\/07\/Medienbericht_2022-08_Fassade-abfraesen-mit-Praezision-1.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-f579e2df-c02e-4f67-a9cb-2ca7bedea816\"><\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>While renovating of a school building, the contracting company used a KEMROC EX 60 HD planer. One part of the renovation process of a school in Giessen (Germany) was to replace the building\u2019s fa\u00e7ade. As the reinforced concrete shell could not be removed by hand, Leinweber, a construction and demolition company, rented a KEMROC EX [&hellip;]<\/p>","protected":false},"author":1,"featured_media":4126,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[596],"tags":[],"class_list":["post-8154","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-reports"],"acf":[],"_links":{"self":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts\/8154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/comments?post=8154"}],"version-history":[{"count":0,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts\/8154\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/media\/4126"}],"wp:attachment":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/media?parent=8154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/categories?post=8154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/tags?post=8154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}