{"id":12133,"date":"2025-01-15T10:03:33","date_gmt":"2025-01-15T09:03:33","guid":{"rendered":"https:\/\/www.kemroc.com\/?p=12133"},"modified":"2025-01-15T10:17:43","modified_gmt":"2025-01-15T09:17:43","slug":"ek-and-ekt-teamwork-in-pipeline-construction","status":"publish","type":"post","link":"https:\/\/kemroc.com\/staging\/ek-and-ekt-teamwork-in-pipeline-construction\/","title":{"rendered":"EK and EKT: Teamwork in pipe\u00adline construction"},"content":{"rendered":"<h3 class=\"wp-block-heading\">To install underground services, an EK&nbsp;150 chain cutter and an EKT&nbsp;220 rotary drum cutter are used for low-vibration removal of solid dolomite rock.<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">At a project to demolish and re-construct the Ludwig-Uhland-Halle in G\u00e4rtringen (Baden-W\u00fcrttemberg, Germany), the company Peter Gross Bau was awarded the contract for the complete renewal of the pipeline layout in order to integrate the future building into the municipal infrastructure. Included in the tender was the low-vibration removal of around 3,000 m\u00b3 of dolomite rock. Using unconventional equipment \u2013 a 35-tonne excavator with a KEMROC EK\u00a0150 chain cutter and a 75-tonne excavator with a KEMROC EKT\u00a0220 drum cutter \u2013 the project was almost fully completed by the winter break \u2026<\/p>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-2e4f4a78-b29e-4528-8c13-d621303b0827\" href=\"https:\/\/kemroc.com\/us\/us\/wp-content\/uploads\/2025\/01\/Media-Report_2025-01_Teamwork-in-pipeline-construction.pdf\">Media-Report_2025-01_Teamwork-in-pipeline-construction<\/a><a href=\"https:\/\/kemroc.com\/us\/us\/wp-content\/uploads\/2025\/01\/Media-Report_2025-01_Teamwork-in-pipeline-construction.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-2e4f4a78-b29e-4528-8c13-d621303b0827\">Herunterladen<\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>To install underground services, an EK&nbsp;150 chain cutter and an EKT&nbsp;220 rotary drum cutter are used for low-vibration removal of solid dolomite rock. At a project to demolish and re-construct the Ludwig-Uhland-Halle in G\u00e4rtringen (Baden-W\u00fcrttemberg, Germany), the company Peter Gross Bau was awarded the contract for the complete renewal of the pipeline layout in order [&hellip;]<\/p>","protected":false},"author":12,"featured_media":12088,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[596],"tags":[],"class_list":["post-12133","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-reports"],"acf":[],"_links":{"self":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts\/12133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/comments?post=12133"}],"version-history":[{"count":0,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts\/12133\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/media\/12088"}],"wp:attachment":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/media?parent=12133"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/categories?post=12133"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/tags?post=12133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}