{"id":10465,"date":"2023-11-28T08:45:51","date_gmt":"2023-11-28T07:45:51","guid":{"rendered":"https:\/\/www.kemroc.com\/demolishing-concrete-using-the-cut-break-method-clone\/"},"modified":"2023-12-04T12:41:41","modified_gmt":"2023-12-04T11:41:41","slug":"double-dose-of-precision-tooling","status":"publish","type":"post","link":"https:\/\/kemroc.com\/staging\/double-dose-of-precision-tooling\/","title":{"rendered":"KR and EK cutters: A double dose of precision tooling"},"content":{"rendered":"<h3 class=\"wp-block-heading\">A KEMROC KR 120 rotary drum cutter and an EK 40 chain cutter complete site preparation work efficiently and accurately.<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The &#8220;K\u00f6nigsteiner H\u00f6fe&#8221; is a new residential and commercial quarter being constructed in the middle of K\u00f6nigstein im Taunus in the German state of Hesse. Acting as a subcontractor to the K\u00f6ster Group, the company H\u00f6fling Erdbau was engaged to complete the site preparation work. Using two excavators with cutter attachments from KEMROC, the contractor put all the bored pile walls in place and put in the drainage systems efficiently and to the required accuracy \u2026<\/p>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-34f1d0d6-489a-4b76-92ad-1d16c63c4d0f\" href=\"https:\/\/kemroc.com\/us\/us\/wp-content\/uploads\/2023\/11\/Media-Report_2023-10_Double-dose-of-precision-tooling.pdf\">Media-Report_2023-10_Double-dose-of-precision-tooling<\/a><a href=\"https:\/\/kemroc.com\/us\/us\/wp-content\/uploads\/2023\/11\/Media-Report_2023-10_Double-dose-of-precision-tooling.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-34f1d0d6-489a-4b76-92ad-1d16c63c4d0f\"><\/a><\/div>","protected":false},"excerpt":{"rendered":"<p>A KEMROC KR 120 rotary drum cutter and an EK 40 chain cutter complete site preparation work efficiently and accurately. The &#8220;K\u00f6nigsteiner H\u00f6fe&#8221; is a new residential and commercial quarter being constructed in the middle of K\u00f6nigstein im Taunus in the German state of Hesse. Acting as a subcontractor to the K\u00f6ster Group, the company [&hellip;]<\/p>","protected":false},"author":12,"featured_media":10332,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[596],"tags":[],"class_list":["post-10465","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-media-reports"],"acf":[],"_links":{"self":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts\/10465","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/comments?post=10465"}],"version-history":[{"count":0,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/posts\/10465\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/media\/10332"}],"wp:attachment":[{"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/media?parent=10465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/categories?post=10465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kemroc.com\/staging\/wp-json\/wp\/v2\/tags?post=10465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}